Skip to Main Content

Client

Torus

Description

Originally beginning as a spec suite, PIDC started work at Torus-Cabot mid-October 2021. After work began, Torus signed onto the project, making design changes that ultimately culminated in a 19,000 sf space of open office areas, laboratory spaces, conference rooms, and informal meeting spaces. To enable the space mechanically, PIDC installed a new 15,000 CFM Daikin Applied Air Handling Unit and a new Plasticair Exhaust Air Handling Unit, both of which were rigged and set to the roof. Additionally, PIDC relocated a 400-ton York Chiller from one TDC’s other buildings using a large crane set up in the parking lot and a rig out of an old, abandoned chiller to then rig in the new, larger chiller through a roof hatch into the penthouse.

Our Portfolio

Explore similar projects

Industrial & Advanced Tech, Commercial

Aspen Aerogels

Office & Lab Renovations
View Details
Life Sciences, Commercial

5 Burlington Woods

Core/Shell Infrastructure Upgrades & Spec Labs
View Details
Industrial & Advanced Tech, Commercial

Technip Woodrock

Existing Offices/Lab Upgrades
View Details

Let’s work together.

Looking to bring a big vision to life?
Learn more about how we can help ensure your project’s success.

Copyright © PIDC Construction LLC. All rights reserved.